Haaglanden Medisch Centrum Westeinde

Commissioned by Croonwolter&Dros, we carried out various activities for the expansion of the OR complex at the Westeinde location.

Expansion OR complex Den Haag

The construction work was commissioned by Hegeman. Medexs constructed the air supply systems and structural work of the rooms below:

  • A Hybrid OR with a Philips Azurion Flexmove tripod
    • This space is classified as a Class 1, performance level 1 space in accordance with VCCN RL7
  • A Body Angio
    • This space is classified as a Class 1, performance level 2 space in accordance with VCCN RL7
  • Two prep rooms, both equipped with a crossflow system
  • Sterile storage equipped with HEPA filters

Duration

UNKNOWN

Plot size

Expansion OR complex

Client

Croonwolter&Dros

Medexs classified medical buildings and spaces.